This project consisted of the demolition of three existing steel buildings totaling 32,000 SF. Included in the work was HAZMAT testing, abatement for asbestos, lead, PCB’s, and contaminated soils, erosion and sediment control installation and maintenance, structure and utility demolition, hauling and disposal, final grading, permanent stabilization, and site restoration.